出租冷再生機(jī)之水泥改良土施工流程!

來源:http://www.393444a.com/ 日期:2021-07-17 發(fā)布人:
一、適用范圍
1、 Scope of application
冷再生機(jī)出租為保證路床厚度范圍內(nèi)的CBR值和壓實度達(dá)到規(guī)范要求,全線路床上部36cm厚采用6%水泥土處理。針對低填淺挖路基,當(dāng)路基填方高度或挖方深度≤155cm時,路床下部44cm厚換填4%的水泥土處理,路床上部36cm厚換填6%水泥土處理。
In order to ensure that the CBR value and compactness within the thickness range of the roadbed meet the specification requirements, the upper part of the roadbed 36cm thick is treated with 6% cement soil. For low filling and shallow excavation subgrade, when the filling height or excavation depth of subgrade is less than or equal to 155cm, 4% of cement soil is replaced with 44cm in the lower part of roadbed, and 6% of cement soil is replaced with 36cm in the upper part of roadbed.
二、作業(yè)準(zhǔn)備
2、 Homework preparation
1、冷再生施工租賃場地準(zhǔn)備一定必須通過審查簽證;需要進(jìn)行地基處理的基底一定完成各項處理,并滿足地基處理的要求。
1. The preparation of cold recycling construction rental site must pass the examination and visa; The foundation that needs to be treated must be treated and meet the requirements of foundation treatment.
(2)場地應(yīng)該保證足夠的平整度,滿足設(shè)備、人員進(jìn)場要求。
(2) The site should be smooth enough to meet the requirements of equipment and personnel.
(3)做好場地的臨時排水和防雨措施。按照施工運(yùn)量和施工機(jī)械的荷載修筑施工便道。
(3) Temporary drainage and rainproof measures should be taken. According to the construction traffic volume and the load of construction machinery, the construction access road is built.
2、技術(shù)準(zhǔn)備
2. Technical preparation
做好相關(guān)人員的技術(shù)培訓(xùn)和技術(shù)交底工作,使參加施工的全體人員充分認(rèn)識高速鐵路路基填筑的關(guān)鍵技術(shù)、質(zhì)量控制要點。
Do a good job in the technical training and technical disclosure of relevant personnel, so that all personnel participating in the construction can fully understand the key technology and quality control points of high-speed railway subgrade filling.
3、勞動力、機(jī)械設(shè)備配置
3. Allocation of labor, machinery and equipment
人員、機(jī)械設(shè)備應(yīng)根據(jù)施工方案組合工期要求進(jìn)行合理的配置。路堤填筑區(qū)為一個完整的作業(yè)區(qū),每個作業(yè)區(qū)人員配置:施工隊長1名,領(lǐng)工員2名,指揮卸土位置人員2名,測量及試驗檢測人員4~6人,其他機(jī)械工、普工20~30人。
Personnel, machinery and equipment should be reasonably allocated according to the requirements of the construction scheme. The embankment filling area is a complete operation area, and the personnel allocation in each operation area is as follows: 1 construction team leader, 2 foreman, 2 personnel commanding the unloading position, 4-6 measurement and test personnel, 20-30 other mechanical workers and general workers.
根據(jù)施工需要,每個作業(yè)面配備反鏟挖掘機(jī)一臺、宣化-140推土機(jī)一臺、YZ-22振動壓路機(jī)兩臺、天工-160平地機(jī)一臺,徐工-230灰土拌和機(jī),自卸運(yùn)輸車6輛,撒水車一臺備用。當(dāng)運(yùn)距較遠(yuǎn)時,自卸車的數(shù)量可適當(dāng)增加。
According to the construction needs, each working face is equipped with a backhoe excavator, a xuanhua-140 bulldozer, two yz-22 vibratory rollers, a tiangong-160 grader, a xcmg-230 lime soil mixer, 6 dump trucks, and a sprinkling truck for standby. When the transportation distance is long, the number of dump trucks can be increased appropriately.

閱讀/ Recommended reading

在道路建設(shè)與養(yǎng)護(hù)工程中,冷再生機(jī)憑借其、等優(yōu)勢,成為眾多施工項目的得力幫手。對于尋求冷再生機(jī)租賃服務(wù)的企業(yè)而言,諸多關(guān)鍵注意事項關(guān)乎租賃體驗與工程成效。In road c...

為什么要選冷再生機(jī)租賃? 2025-03-21
濟(jì)南冷再生機(jī)租賃的優(yōu)勢和現(xiàn)狀 2025-03-20
你知道冷再生機(jī)出租的優(yōu)勢特點、適用場景嗎? 2025-03-20
歡迎來看冷再生機(jī)出租道路養(yǎng)護(hù)與建設(shè) 2025-03-18

產(chǎn)品/ Recommended products

国产熟女内射|亚洲一区二区三区欧美|女人把腿张开让男人桶|久久国产亚洲

亚洲免费观看av| 成人一区在线观看| 黄色激情五月天| 日韩欧美精品| 69久久久久精品9999| 91精品夜夜夜一次毛片| 成人av在线观看网站| 亚洲va天堂va国产va久| 人人妻人人妻| 精品人妻码一区二区三区剧情| www.av中文字幕| av制服av人妻av中文av| 一区二区三区四区av| 精品久久久久久久久久久aⅴ| av日韩中文字幕| 色婷婷5月天| 亚洲综合伊人久久| 狠狠操人妻| 国产又色又爽又高潮免费| 亚洲乱码中文字幕久久孕妇黑人| 国产精品suv一区| 强乱中文字幕av一区乱码| 成人午夜亚洲精品无码网站| 国产亚洲99久久精品| 久久国产高潮| 粉粉嫩嫩的18虎白女| 久久久国产精品入口麻豆| 日韩欧美精品在线视频| 成人午夜精品久久久久久久蜜臀 | 午夜爽爽爽男女免费观看视频| 中国老女人毛片| 欧美性xxxxx极品少妇偷拍| 熟女精品熟女视频在线| 欧美激情中文字幕日韩精品| 久蜜av色av熟女一区| jizz性欧美59| 亚洲国产成人精品久久| 久久看毛片| 人妻久久久| 波多野结衣电影| 中文字幕人妻一区二区三级一区|