国产熟女内射|亚洲一区二区三区欧美|女人把腿张开让男人桶|久久国产亚洲

冷再生施工和機(jī)械租賃業(yè)務(wù)
筑路架橋,奉獻(xiàn)社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心冷再生機(jī)施工時對材料用量的計算

冷再生機(jī)施工時對材料用量的計算

來源:http://www.393444a.com/ 日期:2023-05-22 發(fā)布人:
(1)根據(jù)原道路再生深度內(nèi)的平均密度,計算每平米新料的添加量。
(1) Calculate the amount of new material added per square meter based on the average density within the regeneration depth of the original road.
(2)根據(jù)每車料的質(zhì)量或體積,計算每車料的堆放距離。
(2) Calculate the stacking distance of each vehicle based on its mass or volume.
(3)采用人工擺放和攤鋪水泥,應(yīng)根據(jù)水泥用量3.9%,計算每水泥穩(wěn)定層需要的水泥用量17.4kg,確定水泥擺放的縱橫間距。
(3) Using manual placement and paving of cement, the cement dosage required for each square meter of cement stable layer should be calculated based on 3.9% of the cement dosage, and the vertical and horizontal spacing of cement placement should be determined.
冷再生機(jī)行進(jìn)速度應(yīng)根據(jù)路面損壞狀況和冷再生深度進(jìn)行調(diào)整,一般為5m/min~7m/min,使得銑刨后料的級配波動范圍不大。應(yīng)根據(jù)道路兩側(cè)設(shè)置的水平控制樁,定期核查再生深度是否正確,如冷再生深度超過設(shè)計深度±1cm,應(yīng)查明原因后再繼續(xù)施工。冷再生機(jī)后應(yīng)有專人進(jìn)行質(zhì)量控制,隨時檢查再生深度、水泥含量和含水量,并配合再生機(jī)操作員進(jìn)行調(diào)整。
The travel speed of the cold recycling machine should be adjusted based on the damage condition of the road surface and the depth of cold recycling, generally ranging from 5m/min to 7m/min, so that the fluctuation range of the material grading after milling is not large. Regular verification of the correct regeneration depth should be carried out based on the horizontal control piles set on both sides of the road. If the cold regeneration depth exceeds the design depth by ± 1cm, the cause should be identified before continuing construction. After the cold regeneration machine, there should be a dedicated person for quality control, who should check the regeneration depth, cement content, and water content at any time, and cooperate with the regeneration machine operator to make adjustments.
冷再生機(jī)租賃
冷再生機(jī)租賃廠家再來講講試驗段施工:
Let's talk about the construction of the experimental section again from the rental manufacturer of the cold regeneration machine:
(1)根據(jù)經(jīng)驗和所用冷再生機(jī)械的特點,按6m/min再生機(jī)行進(jìn)速度和轉(zhuǎn)子速度的組合方案對舊路進(jìn)行銑刨,取銑刨后具有代表性的材料送往試驗室進(jìn)行篩分,級配已接近理想級配。
(1) Based on experience and the characteristics of the cold recycling machinery used, the old road was milled using a combination plan of 6m/min recycling machine travel speed and rotor speed. After milling, representative materials were sent to the laboratory for screening, and the grading was close to the ideal grading.
(2)按照室內(nèi)試驗結(jié)果,在舊路上攤鋪新加料或填料,但不添加穩(wěn)定劑,按(1)確定的方案進(jìn)行銑刨,取銑刨后具有代表性的材料樣品送往實驗室進(jìn)行篩分,如果篩分后的級配與室內(nèi)設(shè)計級配超過允許波動范圍,應(yīng)調(diào)整再生機(jī)速度和轉(zhuǎn)子速度,使銑刨后的級配與室內(nèi)設(shè)計級配相比波動在允許范圍內(nèi)。
(2) According to the indoor test results, pave new materials or fillers on the old road without adding stabilizers, and carry out milling according to the scheme determined in (1). Take representative material samples after milling and send them to the laboratory for screening. If the grading after screening exceeds the allowable fluctuation range compared to the indoor design grading, adjust the speed of the regeneration machine and rotor to ensure that the grading after milling fluctuates within the allowable range compared to the indoor design grading.
(3)根據(jù)穩(wěn)定劑類型,采用1~3種壓實方案進(jìn)行施工(包括壓路機(jī)噸位、碾壓順序、遍數(shù)等),以確定為合理的碾壓方案。
(3) According to the type of stabilizer, 1-3 compaction schemes are used for construction (including roller tonnage, compaction sequence, number of passes, etc.) to determine the reasonable compaction scheme.
(4)取冷再生機(jī)經(jīng)銑刨、拌和后的混合料,送往試驗室,對以水泥作為穩(wěn)定劑的冷再生,測定冷再生混合料的含水量、水泥量,并按公路工程無機(jī)結(jié)合料穩(wěn)定材料試驗規(guī)程要求成型試件,測定其7d無側(cè)限抗壓強(qiáng)度。
(4) Take the mixture from the cold recycling machine after milling and mixing, and send it to the laboratory. For the cold recycling mixture with cement as the stabilizer, measure the water content and cement content of the cold recycling mixture, and shape the test piece according to the requirements of the test code for inorganic binder stabilized materials in highway engineering, and measure its 7-day unconfined compressive strength.
(5)對試驗段的彎沉、壓實度、平整度、厚度、寬度等指標(biāo)進(jìn)行檢測。
(5) Inspect the deflection, compaction, flatness, thickness, width and other indicators of the experimental section.
根據(jù)試驗段的結(jié)果確定冷再生混合料的級配、施工時采用的再生機(jī)行進(jìn)速度、轉(zhuǎn)子速度及再生結(jié)構(gòu)壓實工藝。更多相關(guān)事項就來我們網(wǎng)站http://www.393444a.com咨詢了解!
Based on the results of the experimental section, determine the gradation of the cold recycled mixture, the traveling speed of the recycling machine used during construction, the rotor speed, and the compaction process of the recycling structure. For more related matters, come to our website http://www.393444a.com Consultation and understanding!

閱讀/ Recommended reading

在道路建設(shè)與養(yǎng)護(hù)工程中,冷再生機(jī)憑借其、等優(yōu)勢,成為眾多施工項目的得力幫手。對于尋求冷再生機(jī)租賃服務(wù)的企業(yè)而言,諸多關(guān)鍵注意事項關(guān)乎租賃體驗與工程成效。In road c...

為什么要選冷再生機(jī)租賃? 2025-03-21
濟(jì)南冷再生機(jī)租賃的優(yōu)勢和現(xiàn)狀 2025-03-20
你知道冷再生機(jī)出租的優(yōu)勢特點、適用場景嗎? 2025-03-20
歡迎來看冷再生機(jī)出租道路養(yǎng)護(hù)與建設(shè) 2025-03-18

產(chǎn)品/ Recommended products

国产熟女内射|亚洲一区二区三区欧美|女人把腿张开让男人桶|久久国产亚洲

国产精品乱码久久久久久久久| 亚洲熟女一区二区| 欧美不卡一区二区| 另类激情亚洲| 熟妇人妻中文字幕| 人妻精品久久久久中文字幕2018| 国产肉体xxxxx裸体i37| 天堂网视频在线观看| 久久精品99国产| av日韩在线看| 久久久亚洲av| 国产一级黄色片子| 国产中文字幕在线观看| aaaaaaaaa毛片线aaaa片| 成人午夜在线观看视频| 日韩欧美成人影院| 亚洲伊人av| 亚洲欧洲日韩一区二区三区| 欧美另类一区二区三区| 97在线精品视频| www日本高清| 色哟哟一区二区国产精品免费观看| av免费网站观看| 荫蒂被男人添的好舒服视频小说| 久久久久久亚洲| xxxx高清色视频在线播放 | 黑人巨大精品欧美黑寡妇| 国产精品一区不卡| xxxxwww国产| 国产三级成人| 国产精品久久伊人| 精品亚洲一区二区三区四区| 亚洲香蕉视频网| 9av国产熟女| 69精品久久久久久久| 人人爽人人做人人揉人妻| jizz日本女人| 中字幕精品一区二区三区| 亚洲欧美日韩天堂| 56av国产精品久久久久久久| jlzzjizz中国高潮喷水|