強(qiáng)夯機(jī)設(shè)備施工過程中應(yīng)有人專門負(fù)責(zé)監(jiān)測工作
來源:http://www.393444a.com/ 日期:2022-06-27 發(fā)布人:
(1)開夯前應(yīng)檢查夯錘重和落距,以確保單擊能量符合設(shè)計(jì)要求。
(1) Before tamping, the weight and falling distance of the rammer shall be checked to ensure that the click energy meets the design requirements.
(2)每遍夯擊前,應(yīng)對夯點(diǎn)放線進(jìn)行復(fù)核,夯完后檢查夯坑位置,發(fā)現(xiàn)偏差及時(shí)糾正。
(2) Before each tamping, the setting out of tamping points shall be rechecked. After tamping, the position of tamping pit shall be checked, and any deviation found shall be corrected in time.
(3)按要求檢查每個夯點(diǎn)的夯擊次數(shù)和每次的夯沉量。
(3) Check the tamping times and tamping settlement of each tamping point as required.
(4)在夯擊中,當(dāng)發(fā)現(xiàn)地質(zhì)條件與設(shè)計(jì)提供的數(shù)據(jù)不符時(shí)應(yīng)及時(shí)會同有關(guān)部門研究處理。
(4) When the geological conditions are found to be inconsistent with the data provided by the design during compaction, it shall be timely studied and handled with relevant departments.
(5)施工中對方案制定的工作量或要求進(jìn)行改變時(shí),應(yīng)報(bào)上級主管技術(shù)部門批準(zhǔn)后方可施工。
(5) In case of any change to the workload or requirements formulated in the scheme during construction, it shall be reported to the superior competent technical department for approval before construction.
(6)強(qiáng)夯施工中應(yīng)在現(xiàn)場及時(shí)對各項(xiàng)參數(shù)及施工情況進(jìn)行詳細(xì)記錄。
(6) During dynamic compaction construction, various parameters and construction conditions shall be recorded in detail on site.
(7)強(qiáng)夯過程中夯坑周圍不應(yīng)有過大的隆起,如有異常及時(shí)報(bào)告監(jiān)理工程師,會同設(shè)計(jì)、業(yè)主等部門再作處理辦法。
(7) During dynamic compaction, there shall be no excessive uplift around the tamping pit. If there is any abnormality, it shall be reported to the supervising engineer in time, and the handling method shall be made together with the design department, the owner and other departments.


(8)夯坑應(yīng)當(dāng)日施工,當(dāng)日推平,以防下雨泡水。
(8) The tamping pit shall be constructed and leveled on the same day to prevent rain and water.
(9)竣工驗(yàn)收后的強(qiáng)夯場地應(yīng)及時(shí)投入使用,不應(yīng)久置。
(9) The dynamic compaction site after completion acceptance shall be put into use in time and shall not be left for a long time.
(10)強(qiáng)夯竣工面應(yīng)防止重型車輛碾壓。
(10) The finished surface of dynamic compaction shall be prevented from being rolled by heavy vehicles.
冷再生機(jī)租賃廠家認(rèn)為該設(shè)備的強(qiáng)夯法不僅能提高地基土的強(qiáng)度,降低其壓縮性,還能改善抗振動液化的能力和土的濕陷性,因此它不僅適用于處理碎石土、砂土、粉土、黏性土、雜填土和素填土地基,還常用于處理可液化砂土地基和濕陷性黃土地基。
The leasing manufacturer of the cold recycling machine believes that the dynamic compaction method of the equipment can not only improve the strength of the foundation soil, reduce its compressibility, but also improve the anti vibration liquefaction ability and eliminate the collapsibility of the soil. Therefore, it is not only applicable to the treatment of gravel soil, sandy soil, silty soil, cohesive soil, miscellaneous fill and plain fill foundation, but also often used to treat liquefiable sand soil foundation and collapsible loess foundation.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://www.393444a.com并咨詢我們的工作人員,將竭誠為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.393444a.com And consult our staff, will serve you wholeheartedly.
閱讀/ Recommended reading
- 為什么要選冷再生機(jī)租賃? 2025-03-21
- 濟(jì)南冷再生機(jī)租賃的優(yōu)勢和現(xiàn)狀 2025-03-20
- 你知道冷再生機(jī)出租的優(yōu)勢特點(diǎn)、適用場景嗎? 2025-03-20
- 歡迎來看冷再生機(jī)出租道路養(yǎng)護(hù)與建設(shè) 2025-03-18
冷再生機(jī)租賃:多維度注意事項(xiàng)解析
[2018-08-23]
在道路建設(shè)與養(yǎng)護(hù)工程中,冷再生機(jī)憑借其、等優(yōu)勢,成為眾多施工項(xiàng)目的得力幫手。對于尋求冷再生機(jī)租賃服務(wù)的企業(yè)而言,諸多關(guān)鍵注意事項(xiàng)關(guān)乎租賃體驗(yàn)與工程成效。In road c...