首頁>>新聞中心冷再生機出租之水泥改良土施工流程

冷再生機出租之水泥改良土施工流程

來源:http://www.393444a.com/ 日期:2021-07-30 發(fā)布人:
一、適用范圍
1、 Scope of application
冷再生機出租為保證路床厚度范圍內(nèi)的CBR值和壓實度達到規(guī)范要求,全線路床上部36cm厚采用6%水泥土處理。針對低填淺挖路基,當路基填方高度或挖方深度≤155cm時,路床下部44cm厚換填4%的水泥土處理,路床上部36cm厚換填6%水泥土處理。
In order to ensure that the CBR value and compactness within the thickness range of the roadbed meet the specification requirements, the 36cm thick upper part of the roadbed of the whole line is treated with 6% cement soil. For low fill and shallow excavation subgrade, when the subgrade filling height or excavation depth is ≤ 155cm, the 44cm thick lower part of the roadbed shall be replaced with 4% cement soil, and the 36cm thick upper part of the roadbed shall be replaced with 6% cement soil.
二、作業(yè)準備
2、 Job preparation
1、冷再生施工租賃場地準備
1. Preparation of rental site for cold regeneration construction
(1)直接填筑的路基基底,施工前必須通過審查簽證;需要進行地基處理的基底必須完成各項處理,并滿足地基處理的要求。
(1) The subgrade base directly filled must pass the examination and visa before construction; For the base requiring foundation treatment, various treatments must be completed and meet the requirements of foundation treatment.
(2)場地應該保證足夠的平整度,滿足設備、人員進場要求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好場地的臨時排水和防雨措施。按照施工運量和施工機械的大荷載修筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the construction traffic volume and the large load of construction machinery.
2、技術準備
2. Technical preparation
做好相關人員的技術培訓和技術交底工作,使參加施工的全體人員充分認識高速鐵路路基填筑的關鍵技術、質(zhì)量控制要點。
Do a good job in technical training and technical disclosure for relevant personnel, so that all personnel participating in the construction can fully understand the key technologies and quality control points of subgrade filling of high-speed railway.
3、勞動力、機械設備配置
3. Allocation of labor force and mechanical equipment
人員、機械設備應根據(jù)施工方案組合工期要求進行合理的配置。路堤填筑區(qū)為一個完整的作業(yè)區(qū),每個作業(yè)區(qū)人員配置:施工隊長1名,領工員2名,指揮卸土位置人員2名,測量及試驗檢測人員4~6人,其他機械工、普工20~30人。
The combination of machinery and equipment shall be reasonable according to the requirements of construction period. The embankment filling area is a complete operation area, and the staffing of each operation area is: 1 construction team leader, 2 foremen, 2 personnel directing the unloading position, 4 ~ 6 measurement and test personnel, and 20 ~ 30 other mechanics and general workers.
根據(jù)施工需要,每個作業(yè)面配備反鏟挖掘機一臺、宣化-140推土機一臺、YZ-22振動壓路機兩臺、天工-160平地機一臺,徐工-230灰土拌和機,自卸運輸車6輛,撒水車一臺備用。當運距較遠時,自卸車的數(shù)量可適當增加
According to the construction needs, each working face is equipped with one backhoe excavator, one xuanhua-140 bulldozer, two yz-22 vibratory rollers, one tiangong-160 grader, xcmg-230 lime soil mixer, 6 dump trucks and one sprinkler for standby. When the transportation distance is long, the number of dump trucks can be increased appropriately

閱讀/ Recommended reading

在道路建設與養(yǎng)護工程中,冷再生機憑借其、等優(yōu)勢,成為眾多施工項目的得力幫手。對于尋求冷再生機租賃服務的企業(yè)而言,諸多關鍵注意事項關乎租賃體驗與工程成效。In road c...

為什么要選冷再生機租賃? 2025-03-21
濟南冷再生機租賃的優(yōu)勢和現(xiàn)狀 2025-03-20
你知道冷再生機出租的優(yōu)勢特點、適用場景嗎? 2025-03-20
歡迎來看冷再生機出租道路養(yǎng)護與建設 2025-03-18

產(chǎn)品/ Recommended products

国产熟女内射|亚洲一区二区三区欧美|女人把腿张开让男人桶|久久国产亚洲

日日干天天| 熟女av一区二区| 狠狠爱综合| 亚hairy多毛pics大全视频| 中文字幕人妻丝袜| 日韩精品中文字幕一区二区| 19videosex性欧美69| 大肉大捧一进一出免费| 国产熟女伦一区二区| 欧美久久人妻| 亚洲av888| 欧美激情第八页| www.在线观看av| 欧美老熟妇乱子伦视频| 老熟女高潮喷了一地| 99在线观看视频| 荫蒂添得好舒服视频观看| 九九热精品在线观看| 国产精品毛片久久| 国产又大又黄又粗| 久久综合色网| 精品国产福利| 搞黄网站在线观看| 国产中文字幕二区| 亚洲av区一区二区三区色婷婷| 国产伦精品一区二区三区动漫视频 | 人妻精品中文字幕| 亚洲av不卡在线观看| 亚洲天堂av一区二区三区| 欧美午夜免费| 久久久成人精品一区二区三区| 97色在线观看| jav精品人妻| 亚洲国产欧美日韩在线精品一区| 午夜精品视频一区二区三区| 国产特黄aaa大片免费观看| www.国产一区二区三区| 中文字幕一区二区人妻| 996久久国产精品线观看| 国产欧美日韩在线视频| 91国偷自产一区二区三区蜜臀|